GBP/SCOPE/IGESS掲示板

GBP/SCOPE/IGESS

Pathways change inside the Ichigaya campus


Due to the demolition of Buildings 55 and 58, the pathways inside the Ichigaya campus will be changed (as in the attached PDF file) from May 1st, 2019 until January 31st, 2020.
Therefore, it may take longer to move to different buildings.
Please make sure you have enough time to move between classes.

Pathways change inside the Ichigaya campus (map) (PDF)

We deeply apoligize for any inconvenience caused.
Thank you in advance for your cooperation.